Arch Bridge Grubental

Goldisthal

Client
DB Netz AG
Construction time
Completion 2012
Awards
German Bridge Construction Prize 2016 - Nominated in the category 'Road and Rail Bridges'
Structural Engineering
ZRS Ingenieure

New construction of bridge for railway connection between Nürnberg and Berlin.

It has a total length of 215m and an arch hight of 35m, which concluded into a load of 11.000t on the shoring scaffold.

ZRS engineer services was planning of structural system to support the arches and the bridge structure.