On Site 02 | Holz Ziegel Lehm – Pilot Project Sustainable Housing Berlin

The two buildings of the pilot project Holz Ziegel Lehm in Alt-Britz are constantly rising. The envelope of the timber construction has now been completed, after the roof was installed last week. In the brick building, the exterior walls of all five floors are built. The roof will be installed in January, allowing the dry construction work with earth and the technical building services to begin in both buildings.

Photos 1–4: STADT UND LAND/Christian Kruppa
Photos 5–7: Arge ZRS Architekten und Bruno Fioretti Marquez

Posted on: 17. December 2024