• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Teilsanierung Französisches Gymnasium | Sanierung
ON SITE 01 | Partial Refurbishment Französisches Gymnasium, Berlin

The refurbishment of the 26 individual roof areas of the “Französisches Gymnasium” (“French Gymnasium”) in Berlin Tiergarten is progressing steadily. …

wertschau Ausstellung auau Galerie
6 November – 4 December 2025 | Exhibition wertschau | auau, Hamburg

Vernissage 06.11.2025, 7 pm Finissage 04.12.2025, 7 pm The upcoming exhibition wertschau opens at the auau Raum für Architektur in …

ARTIS WORKSHOP AWARDED IN THE FIRST BERLIN TIMBER CONSTRUCTION PRIZE

As timber buildings are becoming more and more important in the development of the city, the administration of Berlin has …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line