• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Bauhaus-Universität Weimar Lehmbau
30.9 – 2.10.2025 | Seminar Series on Building with Earth

At the end of the month, the Weiterbildungsakademie of the Bauhaus University Weimar will host a seminar series on the …

On Site | LELF Paulienenaue

At the LELF construction site great progress has been done on the building envelope. The mounting of the façade, consisting …

Competition “Multitalent Gesucht” – OSSIETZKY-HOF CONVERSION IN NORDHAUSEN, Thuringia / with Hütten & Paläste / 1. PRIZE

Within the context of the IBA Thüringen and supported by the European Regional Development Fund, the transformation of GDR Plattenbauten …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line