• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
8th October 2025 | Symposium “Nachhaltiges Bauen – zirkulär und mit Holz”

The 10th edition of the symposium “Sustainable Building” focuses on two key aspects of resource-efficient construction: the circular economy and …

Heftpartnerschaft DBZ 11|2024 „Experimentelles Bauen"
Publication: Cooperation DBZ 11|2024 “Experimental Construction”

ZRS Architekten Ingenieure cooperated with the editorial team of DBZ (Deutsche BauZeitschrift) in the preparation of the magazine issue focusing …

Lecture ‘Mesopotamian earthen world heritage’ | Prof. Christoph Ziegert | 20.02.2020 | ETH Zürich

The lecture series ‘Lehm ohne Grenzen’, or Earth without boarders in English, is organized by the Swiss Earth building association …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line