• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Interview | Eike Roswag-Klinge on the show Talking Science

Eike Roswag-Klinge in an extended interview about construction and materials on the show Talking Science on RBB. See the episode …

HOLZ ZIEGEL LEHM in Berlin-Britz: A Walk-Through Before Completion

Shortly before completion of the HOLZ ZIEGEL LEHM project in Berlin-Britz, staff from ZRS Architekten Ingenieure and Bruno Fioretti Marquez …

Polis Award 2024 | 1.Preis | Kategorie ökologische Wirklichkeit | Logistikzentrum der Weleda AG
POLIS AWARD 2024 | 1ST PRICE | ECOLOGICAL REALITY CATEGORY

Weleda AG’s new logistics centre has won first prize in the ecological reality category of the Polis Award. The pioneer project …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line