• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
5th Conference on Timber Construction in urban areas | 31.10.2020

For the fifth time the Berlin Senate for Environment, Climate Protection and Transport is hosting a conference for timber construction …

Veröffentlichung: Baunetz Campus | High on Low-Tech
Publication: Baunetz Campus | High on Low-Tech

In an article about low-tech concepts, Baunetz Campus presented our project with Bruno Fioretti Marquez, “Holz Ziegel Lehm – Pilot …

Heinze Architekturfunk #135 | Prof. Andrea Klinge: Die Abrüstung des Bausektors
HEINZE ARCHITEKTURFUNK #135 | PROF. ANDREA KLINGE: THE DISARMAMENT OF THE CONSTRUCTION SECTOR

In a new episode of the Heinze podcast Architekturfunk, Andrea Klinge, ZRS Architekten, talks about the steps that will bring …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line