• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
01_TerraLandscape_14_CAT3_1prize_©ZRSArchitektenIngenieure
TERRA LANDSCAPE ARCHITECTURAL AWARD 2026 FOR THE HEALING GARDEN IN CHAMCHAMAL, KURDISTAN (IRAQ)

Our project HEALING GARDEN – Therapy Centre for Women and Children in Chamchamal, in the autonomous Kurdistan Region in northern …

Expertise “Planning and Building with Wood in Brandenburg” published.

ZRS Architekten Ingenieure stands not only for the planning and construction of timber construction projects, but also for research and …

Beratende Ingenieure Magazin / Flexim Headquarters

Our project Flexim Headquarters has been featured in “Beratender Ingenieure Magazine” with an article entitled “Working better with Timber-Concrete Composite Structures. …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line