• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Angler Heimeran Quartier | Ansicht Hof Anglerstraße | Visualisierung: PONNIE Images
Angler-Heimeran Neighbourhood, Munich | Contract awarded for planning implementation

In the negotiated procedure for the Angler-/Heimeranstraße quarter development in Munich, the bid submitted by the consortium of ZRS Architekten, …

Baustellenupdate 01 | TULIUM
ON SITE 01 | TULIUM

Since May 4, the crane has been turning at the TULIUM museum pavilion https://www.zrs.berlin/project/museums-pavillon-und-touristische-wissenspfade/construction site on the TU Berlin campus. …

On Site 04 | Holz Ziegel Lehm – Pilot Project Sustainable Housing Berlin

The two contrasting twins of the living lab Holz Ziegel Lehm in Berlin Alt-Britz are taking shape: With the interior fit-out …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line