• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Natural Buildings and their Cultural, Climatic and Traditional Values / Prof. Eike Roswag-Klinge / GUtech Oman

Prof. Eike Roswag Klinge will be making a presentation entitled “Natural Buildings and their Cultural, Climatic and Traditional Values” as …

dieNACHWACHSENDEstadt Hub / Make City Festival 2018 / 23 – 28.06

ZRS, as part of the dieNACHWACHSENDEstadt Network, will be co-hosting a Hub and series of accompanying events during the Make City …

BERLIN SCIENCE WEEK | CLIMATE:LAB | 05.11.2021

No more silence in the FOREST – protecting the climate with more biodiversity in the forest. Against this background, the …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line