• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
STUDY: THE GREEN CONSTRUCTION INDUSTRY 2023 – SUSTAINABILITY, ENERGY EFFICIENCY AND CLIMATE NEUTRALITY

The study “The Green Construction Industry” by BauinfoConsult outlines the contours of a transformation of the construction industry. It shows …

Berlin saves Energy

“Berlin spart Energie ” is a campaign for the Berlin Energy and Climate Protection Program (BEK 2030) with the support …

Kick-Off und erster Workshop: Europäisches Forschungsprojekt Greenest
KICK-OFF AND FIRST WORKSHOP: EUROPEAN RESEARCH PROJECT GREENEST

As part of the EU research project ‘GreeNest’ (NEST InGrained ecosystem foR zEro EmissioN buildings), 20 European partners, including ZRS …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line