• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
HOLZ ZIEGEL LEHM in Berlin-Britz: A Walk-Through Before Completion

Shortly before completion of the HOLZ ZIEGEL LEHM project in Berlin-Britz, staff from ZRS Architekten Ingenieure and Bruno Fioretti Marquez …

29. September 2024 | Lehmsteinmauerwerksbau – Ingenieurseminar zu tragendem Lehmsteinmauerwerk nach DIN 18940
11th September 2025 | Engineering seminar on load-bearing earth block masonry acc. to DIN 18940

A new regulatory standard, DIN 18940, has recently been introduced for the design, structural analysis, and construction of load-bearing earth …

Angler Heimeran Quartier | Ansicht Hof Anglerstraße | Visualisierung: PONNIE Images
Angler-Heimeran Neighbourhood, Munich | Contract awarded for planning implementation

In the negotiated procedure for the Angler-/Heimeranstraße quarter development in Munich, the bid submitted by the consortium of ZRS Architekten, …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line